Construction of a new room in the Interventional Radiology Department of the Sant'Eugenio Hospital Centre
Implementing party
ASL Roma 2
Project description
The intervention, within the Interventional Radiology Department, in Building B, Body A of the Sant'Eugenio Hospital Centre, involves the construction of a room for the installation of an angiography device. The main works required for the preparation and equipping of the premises include: the consolidation of the floors and supporting structures, the construction of a new safety staircase, the execution of the electrical and mechanical plant works for the creation of a new power line starting from the transformation cabin, the supply and installation of the electrical panel of the machinery, the installation of the air conditioning and air treatment system.
The Hospital Centre also provides for the installation of a new 256-layer CT scanner, which will replace the current 64-layer scanner and improve the hospital's diagnostic capacity. The operation includes a series of complementary interventions: the renovation of the installation site, the replacement of the electrical panel, the revision of the air conditioning, lighting and medical gas systems, the execution of proteximetric works. In addition to these improvements, a high-end ecotomograph equipped with 5 probes and monitoring stations capable of monitoring up to 24 beds will be purchased.
Status
Planning
Tender stage
Site
End of Work
Estimated completion date
First Quarter 2025
Funding source
Jubilee
Amount allocated
5.856.000,00 €