Functional Upgrading and Safety of the “Fabio Filzi” Preschool and Bridge Section
Implementing party
Project description
The intervention concerns a 1930s building that is part of a school complex consisting of three buildings: Nursery school, preschool and caretaker's house.
The building consists of a ground floor and a first floor with a total height of 10.50 m. The first floor, which is currently disused, was previously used for office activities. The two preschool and nursery activities “bridge section 24-36 months” occupy the entire ground floor of the building. The common entrance hall is characterised by a small space, which is inadequate to accommodate children and parents. Nearby there is a small office room.
Specifically, the interventions aim to achieve better spatial connections (accessibility for children and parents) and structural and plant improvements (fire protection, electrical, plumbing, air conditioning, etc.). The interventions will be aimed at achieving a seismic risk index greater than 0.8.
The project proposal is to increase the current capacity from 64 to 100 children.

Status
Planning
Tender stage
Site
End of Work
Estimated completion date
Second Quarter 2026
Funding source
NRRP
Amount allocated
2.639.000,00 €