Routine maintenance work on Public Residential Buildings at Via Tovaglieri 329
Implementing party
Project description
The project involves the redevelopment of two Public Residential Buildings located at Via Francesco Tovaglieri 329, within the territory of Municipality VI. These buildings will undergo a series of routine maintenance interventions. The work consists of the waterproofing of the two rooftop gardens located between buildings 1, 2 and 3 of the complex. This measure is necessary due to water infiltrations that have been occurring for years in the underground garage and that have been affecting the apartments on the ground floors.
The soil will be removed from the two rooftop gardens, the slopes will be checked, the entire surface will be waterproofed, the rainwater collection drains will be replaced, and the positioning of the garden fences will be adjusted.
Status
Planning
Tender stage
Site
End of Work
Funding source
Roma Capitale Budget
Amount allocated
76.000,00 €