Caput Mundi: Redevelopment of the green area of Colle Oppio Park

Implementing party

Roma Capitale

Project description

The project aims to restore an adequate environmental setting to the large ruins of the Baths of Trajan and the structure of the Domus Aurea. Through a thematic path, set at various levels, all areas of interest will be valorised. Specifically, the following works and projects are planned:
Monumental Portal in Via Nicola Salvi:

  • verification of the structural stability of the first tuff pillar on the left;
  • consolidation of all the eroded tuff surfaces of the portal;
  • reconstruction of the missing parts with appropriate and state-of-the-art materials;
  • protection of stone surfaces with products that counteract the erosive action of atmospheric agents;
  • cleaning of microbiological agents with adequate biocides, final cleaning and application of protective material;
  • repair of the pebble mosaic floor of the steps in front of the pedestrian opening on the right.

Monumental Portal in Via Mecenate:

  • cleaning of travertine pillars;
  • restoration of ornamental elements of the same material;
  • cleaning of brick parts;
  • removal of invasive weeds from tiled roofs;
  • restoration of missing tiles.

Portal in Via delle Terme di Traiano:

  • recovery and adaptation of the systems inside the left propylaeum;
  • cleaning of pillars in the plastered parts and in the travertine stone parts;
  • restoration of ornamental elements of the same material;
  • cleaning of brick parts;
  • removal of invasive weeds from tiled roofs;
  • restoration of missing tiles;
  • restoration of monumental cement grit vases;
  • cleaning of the travertine guard stones.

Gates and Fences:

  • recovery of the damaged parts and painting of gates on: via Labicana, via del Monte Oppio, via delle Terme di Traiano, via delle Terme di Tito, via Nicola Salvi, viale Serapide (access to the upper part of the park), via delle Sette Sale;
  • painting of the entire perimeter fence;
  • construction of a stretch of fence on the slope of via Nicola Salvi.

Water system - Monumental Fountains:

  • activation of a new water system to supply the park's monumental fountains.

Fountain-Nymphaeum:

  • verification of the structural stability of the balustrades showing subsidence and detachments;
  • consolidation of the tuff zoomorphic figures;
  • integration of missing or damaged balustrades;
  • overhaul of the decorative wrought iron parts;
  • arrangement of the external perimeter pavement;
  • cleaning of all stone surfaces.

Petals Fountains (Fontane dei Petali):

  • consolidation of load-bearing tuff structures;
  • cleaning of the lower and upper tank.

Fontana delle Anfore:

  • waterproofing of the basin;
  • central nozzle renovation;
  • compensation for the mixtilinear exedra masonry around the fountain;
  • restoration of decorative amphorae around the fountain.

Artistic drinking water fountains:

  • audit of the water system;
  • restoration of stone and brick surfaces.

Terracing walls in Via Labicana:

  • verification of the stability of the terracing walls on the slope of via Labicana;
  • cleaning of wall sections with brick curtain;
  • consolidation of tuff pillars;
  • repositioning of travertine covers where missing.

Pavements:

  • restoration of the cobblestone ditches;
  • integration of pebble mosaics in various points of the park;
  • integration or replacement of the travertine elevations and stairs on the slopes of via Labicana.

Monumental furnishings:

  • cleaning of all the travertine columns and repositioning of the demolished ones;
  • arrangement of chains in the paths in Viale Monte Oppio;
  • cleaning of benches and possible replacement of damaged ones.

Lighting:

  • specific lighting of some areas of the park for safety and aesthetic reasons.
PNRR

Status

Planning
Tender stage
Site
End of Work

Estimated completion date

Second Quarter 2025

Funding source

NRRP

Amount allocated

1.510.000,00 €