Widespread interventions

Find out about the interventions that involve different areas of the city or are spread across different locations.

Risultati di ricerca

Advanced filters

Extraordinary maintenance of the main access road network: redevelopment of the horizontal and vertical signage including lights, marginal and complementary

Implementing party

Anas

Project description

The proposed intervention relates to the resurfacing of the main roads called "vie Consolari", conducted by ANAS S.p.A. By means of an agreement, the company will be responsible for drafting, approving and implementing the projects with the support of Roma Capitale and Città Metropolitana. The work will be carried out at night, between 9 p.m. and 6 a.m., following a precise timetable in order to limit the inconvenience to citizens and to ensure traffic flow on the roads affected by the works.

Maintenance works are aimed at adapting the road signs to comply with the current regulations. The damaged panels and supports will then be replaced, the missing road signs and pedestrian crossings will be integrated with sequential flashing lights and retro-reflective supplementary devices, and non-compliant panels will be removed.

The roads affected by the intervention are:

Via Ardeatina; Via del Divino Amore; Via Laurentina; Via Nomentana; Via Ostiense; Via Portuense; Via Prenestina; Via Prima Porta Sacrofano; Via Tuscolana; Via Del Mare; Via Dei Laghi; Via Tiberina; Via di Santa Maria Galeria; Via Boccea; Via Della Pisana; Viale Della St. Di Cesano; Viale Di Baccanello; Via Casal Di Selce; Via di Donna Olimpia; Via di Ponte Galeria; Via Trionfale; Via Salaria; Via Casal Boccone; Via Casale San Basilio; Via di Tor Cervara; Via Braccianese; Via Collatina; Via della Storta; Via delle Capannelle; Via Anagnina; Via Appia Nuova; Via della Cecchignola; Via di Grotta Perfetta; Via di Vigna Murata; Tangenziale Est – Olimpica; Via Cristoforo Colombo; Via dei Fiorentini; Viale delle Belle Arti; Viale Regina Elena; Viale Liegi; Viale Regina Margherita; Via Leone XIII; Via Dei Colli Portuensi; Via Della Camilluccia; Via Di Portonaccio; Sacrofanese- Cassia; Pratica di Mare – Ostia.

Working site considered partially closed and operating at the beginning of the Jubilee Year.

Status

Planning
Tender stage
Site
End of Work

Estimated completion date

Second Quarter 2025

Funding source

Jubilee

Amount allocated

20.060.000,00 €