Extraordinary maintenance and adaptation to the fire regulations of the Raimondi school

Implementing party

Roma Capitale – VIII Municipality

Project description

The intervention in progress at the Raimondi school, located in via C.T. Odescalchi, 71/73, has as its main objective both the extraordinary maintenance of the building and its adaptation to current fire regulations. The fire prevention project has been drawn up and approved by the Provincial Fire Brigade Command, and needs to be implemented to ensure the compliance of the building.

The structure of the school is spread over 5 floors, including 1 basement and 4 above ground. In the basement, there is a canteen with kitchen and pantry, workshops and storage rooms, while on the upper floors there are mainly classrooms. The interiors are spacious and equipped with heights exceeding the minimum requirements for educational activities. The elongated building consists of three internal staircases, two of which are located at the ends and one in a central position, connected by corridors that allow the mobility of the occupants. Surrounded on three sides by a courtyard with perimeter fencing, the building is separated from the public street.

To adapt the building to fire regulations, the following interventions will be carried out: 

  • verification and arrangement of building structures (walls and floors) to ensure fire resistance; 
  • installation of fire doors;
  • adjustment of escape routes;
  • implementation of safety signs and installation of fire extinguishers;
  • installation of an electrical and emergency lighting system;
  • verification and integration of the fire-fighting water network;
  • adjustment of the fire alarm system.

 

Moreover, in addition to fire prevention, the works will also include interventions to ensure the general safety of the building and improve the perception of internal spaces by users. These interventions include the restoration of the ruined plaster and the painting of the walls of much of the school, as well as the replacement of the basement windows.

Status

Planning
Tender stage
Site
End of Work

Funding source

Roma Capitale Budget

Amount allocated

658.000,00 €